ZHS proposes two main assembly technologies for prefab compounds, the end result being the same.
1st Option
 |
Shipping aboard a truck an in-factory
pre-assembled house part. |
Erecting it on site alongside its "sisters" |
2nd Option

Pre-assembly of walls, floor and roof in factory, bolt them together on site, and closing off connections points
with flashings.
Note: Floors are optional, one can fix the walls directly on the concrete bases.

Both options yielding the same design. |